Data centre floor upgrade

The infrastructure within this data centre module was at the end of life and required replacement in order to support the critical IT equipment. 

From detailed design to construction and endurance testing, DC Heidi successfully delivered on the following

  • Installation of new transformers and RMU’s
  • Upgrade the IT load of the data floor to 2000/m2 
  • Upgrade 400m2  of the data hall and service corridor floors to “ultra head duty” loading
  • Installation of new input and output switch board in N+N configuration 
  • Installation of overhead power bus ducts
  • Installation of free cooling for the data hall, UPS and battery room
  • Replacement of existing CRAC unit DB’s with new redundant DB’s
  • Installation of mechanical and IT UPS


     SECTOR
     Data Centre

     COMPLETION
     2012

     SERVICE PROVIDED
     Project Management

     LOCATION
     Sydney