The objective of this project was to procure and install a scalable pre constructed Modular Data Centre Unit to conduct a proof of concept and operational trials with live production equipment. This proof of concept validated how on site construction and testing time is reduced with the assembly of all operational infrastructure built in factory prior to delivery and assembly.
As part of the project we conducted a market study and selected a suitable vendor to provide turnkey solution inclusive of all mechanical, electrical, UPS, fire, security, monitoring and alarm services in accordance with the clients design requirements.
The project delivered a operational modular and scalable data centre, suitable for deployment all areas of Australia with
- 30 x 48RU racks at 12kw each
- TIA 942 Tier III compliant power and cooling within the data centre